Mitsubishi Electric Engineering CC-Link IE Field Network compatible RFID interface unit (2-channel connection)
#Grup produk P112752024
Spesifikasi
| Classification | RFID |
|---|---|
| Connection cable | [CC-Link] 1 to 120 / Intelligent Device Station |
| Connector | [Devices] Sequencer |
| Data capacity | Can be written/read with a single ID command: [CC-Link IE Field] 8 to 1016 bytes (variable) set with parameters |
| Data transfer | 8 to 1016 bytes (set by parameter) |
| Depth (mm) | 55 (unit only, excluding connecting antenna cable) |
| External Dimensions / Height (mm) | 70 |
| External Dimensions / Width (mm) | 180 |
| Mass (kg) | 0.3 |
| Number of Connections | [Reader/Writer] 2 units (1 unit when using an antenna with built-in amplifier) |
| Occupied In/Out Points | 0.60A |
| Station Type | [CC-Link IE Field] 1 to 239 |
| Terminal Block | Distributed installation |
Pilih jenis produk yang diinginkan
| Nomor SKU | Model Number | Masa Persiapan Barang | Harga | Jumlah |
|---|---|---|---|---|
| Loading... | ||||
Informasi Produk
Description
The RFID interface unit can easily connect the Omron RFID system V680 series to a Mitsubishi Electric sequencer.
RFID allows us to track individual products (history management) and production status.
Introducing visibility to the manufacturing site with an RFID system: Making all information on the manufacturing site visible contributes to improving productivity and quality.
Two separate amplifier type antennas or one built-in amplifier type antenna can be connected.
It can be installed up to 12,000m away from the CC-Link IE Field Network master station.
The test/measurement functions required for start-up and maintenance are provided as standard.
We provide FBs (function blocks) that allow you to easily create programs.
Monitoring and Traceability Equipment
RFID allows us to track individual products (history management) and production status.
Introducing visibility to the manufacturing site with an RFID system: Making all information on the manufacturing site visible contributes to improving productivity and quality.
Two separate amplifier type antennas or one built-in amplifier type antenna can be connected.
It can be installed up to 12,000m away from the CC-Link IE Field Network master station.
The test/measurement functions required for start-up and maintenance are provided as standard.
We provide FBs (function blocks) that allow you to easily create programs.
Monitoring and Traceability Equipment
Feature
Specification [CC-Link IE Field] Ethernet cable that meets the 1000BASE-T standard [Category 5e or higher (double shielded, STP) straight cable]Ulasan Produk
Tidak ada ulasan




















































































































































